PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Backfilled where the duct bank is located at the Administration Bldg. (800x600).jpg Backfilling and compacting the underground Tele-Data at the Administration Bldg. (800x600).jpg Closing up Elev. 1,2,3 (4th Floor) Facing North-East (800x600).jpg Installing rebar mats at Stair -4 (4th Floor) Facing East (800x600).jpg Installing the shear wall panels at Elev. 1,2,3 (4th Floor) Facing North  (800x600).jpg
Next page Backfilled where the duct bank is located at the Administration Bldg. (800x600)
Backfilled where the duct bank is located at the Administration Bldg. (800x600)